Construction
Five disciplines, and where each one actually is.
A project is not late all over. It is late in one discipline, and the other four find out at the wrong moment. This dial holds the job by discipline — structure, fire, drainage, ventilation, access — each with the inspections, certificates and sign-offs that close it, so the one that is behind is the one you can see.
A discipline is not complete because the programme says so. It is complete when it is signed off.
What the dial holds
Five disciplines and twenty checkpoints beneath them — each one a specific inspection, procurement or certificate rather than a percentage somebody estimated.
Dials created with partners start with a basic dial, and can then have additional sections (the outer ring) and segments (the inner slices) added. There are many other benefits and features we can share with potential partners and clients.
- Project managers holding several disciplines and one date
- Main contractors evidencing progress to a client without a report
- Clients who would rather look than be told
- Complete
Structure
Load calculations, lead times, QC inspections, sign-off milestones
- Complete
Fire
Strategy reviewed, compartmentation logged, certified assets, active systems
- In progress
External drainage
Authority approvals, earthworks, falls and levels, pressure and CCTV tests
- At risk
Ventilation
Spatial coordination, procurement, ductwork integrity, commissioning
- Not started
Accessibility
Design audit, specialist fit-out, lift certification, wayfinding and tactile signage
Bring us the job you are running now.
Bring the disciplines you actually split the work by and we will build the dial around them. Book a call — pick a time that suits you and it goes straight in our diary.